The client did not think the existing space was efficient and really disliked old look. We wanted to expand the bathroom area and allow space for a couple to use since it was technically a master bathroom but was so small. We wanted it to feel like a master bath, so we minimized the wasted open space, while still allowing for closet space and expanding the shower, and allowing for a double vanity. We also replaced the door with a stylish barn door.

Features: Contemporary Walk-in Shower; Floating double vanity
Year: 2021
Location: Hyde Park, Chicago

Bathroom Work We Did

Demolition Work

  • Demo and dispose of existing bathroom fixtures to include vanity sink + faucet, toilet, flooring tile, wall tile, shower fixtures
  • Demo and dispose of existing closet doors and mirrors
  • Demo and dispose of existing wall and door opening as determined by the final design

Rough & Finish Plumbing

  • Installation of new sinks + faucets in new locations as determined by the final design with scope to include 2 sinks total
  • Installation of the toilet in the new location as determined by the final design
  • Installation of shower fixtures and drain in new locations as determined by the final design

Rough & Finish Electrical

  • Install new vanity lights in new locations as dictated by vanity layout design
  • Installation of outlets + switches located by design and GFCI code as needed by design.
  • Installation of overhead lighting in the bathroom
  • Installation of overhead lighting in closet area

Framing

  • Framing of new room/space layout as determined by the final design
  • Framing of new door opening and header as determined by the final design
  • Framing of secondary bathroom wall space as used for new master bathroom space

Drywall + Paint

  • Drywall installation on new framing as needed
  • Drywall installation of new ceilings as needed by design
  • Tape, patch, plaster, sand and finish the new drywall and all existing walls as affected by demolition
  • Paint all walls and ceilings (Color TBD)

Tile Work

  • Supply and installation of cement boards as preparation for tile installation
  • Installation of tile on the bathroom floor, shower floor, shower walls, and threshold
  • Apply grout and seal the new tile

Hardwood Floor Work

  • Patch existing hardwood flooring as needed

Glass Work

  • Supply and install frameless glass shower door/surround

General Work

  • Installation of new vanity and filler as needed
  • Installation of the new door(s) and trimwork
  • Installation of cabinet hardware, accessories

Materials & Brands Used

  • Vanity: James Martin Vanities 389-V72D-A
  • Sinks: Kohler Caxton Rectangle 20-1/4″
  • Faucets: Moen Genta LX Single Handle Centerset
  • Shower Wall Surround: Roca
  • Mirror: Wayfair
  • Flooring: Tile Room Nova Grey
  • Barn Door: Wayfair